18th November 1949, Page 50
18th November 1949
Page 50
Page 50, 18th November 1949
Close
Desigis
The roads in the 1%/1.1.S. area are mostly surfaced with fine chippings, earth and a binding of oil. With this method of road construction, resurfacing can be done at high......
Training Engineers From Scratch
T HE impossible can be done immediately, but miracles take a little longer. This old Army saying came to my mind when I was being conducted through the training centre of the......