3rd January 1928, Page 62
3rd January 1928
Page 62
Page 62, 3rd January 1928
Close
Plywood For Body Construction.
Details of the Up-to-date Production Methods of the Tucker Armoured Plywood Co., Ltd. I T is well known that plywood, both in its plain and metal-protected forms, is now being......
New Models Of A Sliding Tilt.
W E have already drawn atrention in our columns to the merits of the Sparshatt sliding tilt, which is handled in London by Messrs. A. Fleming and Co., 39, Victoria Street, SAVA,......