16th July 1937, Page 53
16th July 1937
Page 53
Page 53, 16th July 1937
Close
A.e.c.'s New £30,000 Service Depot
With a Covered Area of 35,000 sq. ft. the New Depot has Been Planned and Equipped on Most Modern Lines B IJILT at a cost exceeding £.30,000, the new service depot of the......
Alloy Tubular Construction Reduces Body Weight
• Reduces Body Weight • (Left) The British Tubular Construction Co., Ltd., built the 1,000 - cubic - ft. body of this Dennis van, which has tubular pillars and flash-fitting......