AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

High-speed bodybuilding

9th June 1967, Page 49
9th June 1967
Page 49
Page 49, 9th June 1967 — High-speed bodybuilding
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

FOM Dexion Ltd. come details of anew method of building van body frames to customers' requirements; it is said to save as much as 95 per cent on building time.

Known as the Callpri method, it is based on a framework consisting of speedframe, the square-tube construction system from Dexion, and, as an example say the makers, a typical van body framework measuring 14 ft. by 8 ft., can be constructed in two hours by two people. The secret is the 1 irt square steel tube and its ingenious locking system which requires no special tools or skills to assemble.

Marketed by: W. Jones (Manchester) Ltd., Rutland Street Garages, Swinton, Manchester. Tel. Swinton 2036/7/8.

Tags

Locations: Manchester

comments powered by Disqus