AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

ROADWORKS

9th February 1995
Page 31
Page 31, 9th February 1995 — ROADWORKS
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

M61: J5-6, lane 3 and hard shoulder closures on both carriageways; 50mph limit, until June.

M63: J9-11, contrafiow with 50mph limit; J11 northbound access sliproad closed, until March.

Al (M): J34-5, southbound carriageway closed with contraflow on the northbound carriageway, until March.

Al2: Suffolk to Springfield to Marks Tay, lane closures overnight and during offpeak hours, until 22 February.

M1/A564: Derby Southern

Bypass, construction of a new junction and bridge, delays until May 1997. M6:129-32, delays caused by road widening and improvement work until August.

M25: J7-8, widening work, three lanes to be kept open at all times but severe delays expected; 50mph limit. M50: J1-2, bridge strengthening, westbound carriageway closed until March with a contraflow, until June.

• For the latest road news around the UK simply contact one of the following AA Hotline numbers (calls cost 36p/min off-peak; ittlp at al other times):

West Country; (01836) 401 111 Wales: (01836) 401 112. Midlands: 01836) 401 113. Ea st Anglia: (01836) 401 114 North-West: (01836) 401 115 North-Ease 1018361401 116. Scotland: (01836) 401 117 N Ireland: 1018361401 118 London: (01836) 401 122. M4-MI: (01836) 401 123 M1-Dartford: (01836) 401 124. Dartford-M23: (01836) 401 125 M23-M4: (01836) 401 126. M25: (01836) 401 127.

Tags

Locations: London

comments powered by Disqus