AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Ford pick-up

7th August 1982, Page 10
7th August 1982
Page 10
Page 10, 7th August 1982 — Ford pick-up
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

PEM Trailers of Bournemouth has extended its range of all aluminium Clipper bodies for a range of one-ton pick-ups to cater for the new Ford P100 pick-up.

The alloy modular construction incorporates a Luton head, glass fibre roof and a roller shutter to close the aperture, to give almost 5.7cm (200cuft) of secure dry load space.

PEM claims it takes about 20 minutes to attach or remove the body retained by four over centre catches.

Tags


comments powered by Disqus