AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Electric CF wins US order

5th October 1985, Page 26
5th October 1985
Page 26
Page 26, 5th October 1985 — Electric CF wins US order
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

FOLLOWING the success of a single evaluation vehicle, Bedford Commercial Vehicles is to supply a further 35 electric CF vans to the United States for extended operational trials.

The purchase of the vans is being co-ordinated by the US Electric Vehicle Development Corporation, which represents public utilities.

The EVDC chose the electric CF — called the GM Griffon in America — following independent tests carried out with four other manufacturers of electric vehicles.

Phase two of the EVDC programme is being carried out jointly with the Electric Power Research Institute, General Motors, Bedford and Lucas Chloride EV Systems.

It will assess the suitability of the electric CF van for fleet operations in America and establish a system for servic

ing it in North America and Canada.

The project will also identify potential electric van customers and develop marketing strategies to attract them.

The first six electric vans will go to the Detroit Edison power company.

Over 3(f) electric CF vans have already been built by Bedford at its Luton van plant and some are currently being evaluated in the UK and Europe. The Post Office is running 40 electric Us as part of an electric van test programme (CM, November 10, 1984).