AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

NORTH C1RCULAR BLOCKAGE

3rd March 1988, Page 33
3rd March 1988
Page 33
Page 33, 3rd March 1988 — NORTH C1RCULAR BLOCKAGE
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• The Department of Transport has warned motorists in East London to expect temporary Sunday closure of the northbound carriageway of the A406 North Circular Road (the South Woodford to Barking Relief Road) where it crosses the A2 at Redbridge Viaduct.

The carriageway will close on Sundays 6 March and 13 March. The closures will allow repairs to be carried out to a damaged sign gantry on the viaduct.

When signs are in position on these Sundays, drivers wishing to travel north across Redbridge Viaduct will be diverted on to the exit slip road, the Redbridge roundabout and the corresponding entry slip road to rejoin the A406.

Tags

Organisations: Department of Transport
Locations: London

comments powered by Disqus