AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

WM TUNNEL

2nd March 2000, Page 4
2nd March 2000
Page 4
Page 4, 2nd March 2000 — WM TUNNEL
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

The British and Irish transport ministries are to consider a proposal for a 60-mile tunnel linking Holyhead with Dublin. The cost of the link, which would be built using a new System called immersed tube tunnelling, is estimated at around £14bn.

Tags

Locations: Dublin

comments powered by Disqus