AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Frame repair system

28th May 1971, Page 66
28th May 1971
Page 66
Page 66, 28th May 1971 — Frame repair system
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

A Bear heavy-duty frame ar axle repair system that claimed to have a prit advantage over competitor equipment of "several thousar pounds" has been supplied to repairer in this country. by -El Blackhawk Division of AppliE Power (UK) Ltd. The model identical to 1400 systerr marketed in America by AppliE Power.

The system is applied to integral type of chassisib structure without stripping t vehicle. It is claimed that seve accidental damage can rectified in a working day.

Damaged commercial vehicl in the heavy category are drivi onto the trueing and alignme rack which may be pit-mounti or floor-mounted, pit-mountii being recommended.

Trueing is performed by tv 30-ton jacks and two 50-t rams which are movable with the main frame of ti equipment. They are used push or pull chassis members components into their corre positions and can operate in a direction.

Made by: Applied Power (U Ltd, Blackhawk Division, Este Road, Newhaven, Sussex. Price: £10,200.

Tags

Locations: Newhaven

comments powered by Disqus