AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Dartford defeats gales

28th March 1991, Page 7
28th March 1991
Page 7
Page 7, 28th March 1991 — Dartford defeats gales
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• The Dartford Bridge which is due to open in October will be shut to southbound highsided vehicles for fewer than five hours a year.

That is 15 hours less than annual average for the Severn Bridge, claims the Dartford river crossing authority.

High-sided vehicles will only be diverted to the tunnel when winds reach 96kmili (60mph) followed by all vehicles when winds exceed 128km/h (80mph). Northbound traffic will use the tunnel.

The bridge which is expected to cost g100m to build, will give the crossing a daily capacity of 135,000 vehicles. The two tunnels were only designed for 60,000 vehicles a day, but an average of 85,000 use them, peaking at over 100,000 vehicles.

The authority says that the tunnels and bridge will be fully integrated.

Tags


comments powered by Disqus