BLACKWALL CLOSED ▪ southbound Blackwall
28th February 1987, Page 22
28th February 1987
Page 22
Page 22, 28th February 1987
— BLACKWALL CLOSED ▪ southbound Blackwall
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.
If you've noticed an error in this article please click here to report it so we can fix it.
Tunnel is to be closed at weekends for maintenance work. Until the end of March it will be closed from lOpm Friday to Sam Monday.
Southbound traffic, says the DTp, should use the Dartford Tunnel, Woolwich Ferry, Tower Bridge (5t unladen limit) or the Rotherhithe Tunnel (maximum width 2,286mm; maximum height, 4.496mm).