THE accoMpanying schedule, to which reference was made in last week's issue, shows minimum rates which have been agreed upon for the haulage of stone and ballast from various quarries in Devon to Yelverton. These rates have heen approved by the consignee, after consultation with the quarry owners and hauliers.

The following conditions cover the application of these rates. They are subject to loading being by chute or by mechanical excavator, or that there be reasonable assistance given if loading be by hand. Whem a non-tipping vehicle is used, assistance is to be given for unloading without delay. Accounts aro to be rendered on -the Monday morning of each week for work carried out up to and including the previous Saturday; payment will be made on the following Wednesday. The rates are strictly net.

Any further information concerning this work can be had from Mr. Norman J. Bennett, secretary, Devon and Cornwall Area, Associated Road Operators, 5, Princess Square, Plymouth. His telephone number is Plymouth 2408.

SCHEDULE FOR MINIMUM RATES FOR THE HAULAGE OF STONE AND BALLAST FROM QUARRIES TO YELVERTON

Per Per Per Per Yard. Ton. Yard. Ton.

Mls,' s. d. e. d. Mls. s. d. 8. d.

3. 2 0 1 9 16 610 5 8 2 2 34 2 0 17 7 1 6 0% 3 2 7 2 21,4 18 7 4% 64 4 3 0 2 7 19 7 8 6 6 5 3 3 2 9 20 711% 610

6 3 644 3 0 21 8 4 7 1 7 310 3 3 22 6-9 7 4% 8 4 2% 3 8 23 9 0. 7 B 9 46 310 24 9 344 711i4

10 4 9% 4 0 25 9 7 8 2

11 5 1 4 4 26 91044 8 5 10 5 554 4 7 27 10 2 8 744 13 5 10 5 0 28 10 5 B 11

14. 6 1% 5 2 29 10 9 -9 15 6 5 5 544 30 11 0 9 5 30-35 miles, 11s. 94, per yd., 101. 14. per ton. 35-40 miles, 12s. 13d. per yd., 10s. 11d. per ton. 40-45 miles, 1.3.s. 6d. per yd., Ils. 6d. per ton.

Rates for Site Work Only: 3 yards. 5a. 94., 4 yards 7s. 6d„ 5 yards Be. 7d. per hour.