AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

A !antic Trail , Scratchwood Quarry, London Gateway Service Area, M1

26th May 2005, Page 87
26th May 2005
Page 87
Page 87, 26th May 2005 — A !antic Trail , Scratchwood Quarry, London Gateway Service Area, M1
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

Motorway, London NW7 3HU Atlantic imports the Ontariobuilt Titan Thinwall aluminium waste handling trailer with Keith Walking Floor, One, built with horizontal extruded panels is for Josh Fothergill of Derby and is believed to be the first in the UK to feature Keith's latest heavy duty Vee floor system with hydraulically operated cleaning plough.

Running front to rear, it clears rubbish from around the floor planks, and a winch returns it to the bulkhead.

It's a practical spec with manual operation (no electrics), hydraulic top tarp and IMT (US) drum braked axles.With this floor the 13.5m waste carrier costs £53,000 and weighs 10 tonnes but with SAF axles and aluminium wheels it will be a tonne lighter. Contact: Steve Naughton Tel: 020 8959 6220

Tags

Locations: Derby, London

comments powered by Disqus