AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Danzas at Dartford

25th May 1995, Page 28
25th May 1995
Page 28
Page 28, 25th May 1995 — Danzas at Dartford
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• The Swiss-based Danzas Group has completed a freight terminal in Purfleet, Essex, which also serves as a UK and regional head office. The 13-acre site is close to the A13/M25 junction and the Dartford River Crossing. It includes an automated transit handling warehouse which is 136x45m and 6.5m high at its lowest point. Storage area is 6,120m3 with 54 loading bays.

Tags

Locations: The Swiss

comments powered by Disqus