AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Bridge reappraisals

25th June 1971, Page 19
25th June 1971
Page 19
Page 19, 25th June 1971 — Bridge reappraisals
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• Bridges built on the steel box girder principle are to have one lane on each carriageway Closed as a result of advice given by a technical committee, under Dr Alec Merrison, to Mr Peter Walker, Secretary of State for the Environment. There are 42 bridges of this type already in use and all will be subject to the restrictions.. Although many of the bridges have been carrying heavy traffic for some time and it is considered that the risk of post-construction defect is very slight, it has nevertheless been decided to restrict the traffic loading on them until a reappraisal of the design of each has been completed. the reappraisals are expected to take some weeks.

Tags


comments powered by Disqus