• Telehoist of Cheltenham has fitted a 12m 3 line-flow dumper
23rd November 1989, Page 121
23rd November 1989
Page 121
Page 121, 23rd November 1989
— • Telehoist of Cheltenham has fitted a 12m
3 line-flow dumper
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.
If you've noticed an error in this article please click here to report it so we can fix it.
body, of the type formerly used on Magirus Deutz chassis, to a Hino 6 x 4 FS217KD supplied by Pacific Commercials.
It will join the 12 Maggies run by Welsh demolition site operator R Collingbourne. The 5.0m all-steel, 15° scowended body has a lOmm floor, 5.0m sides and tips via Telehoist's 22C64 hydraulic ram with lower subframe and mechanical linkage.
Hydraulic power is supplied by the Hino HC.065 gearboxdriven, Geo Mellor-supplied PZB (Italy) PTO and Dowty shaft-driven pump.