AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

101 CHARROLD

22nd September 1972
Page 138
Page 138, 22nd September 1972 — 101 CHARROLD
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

Charrold Ltd, St Peter's Road, Huntingdon PE18 70L. Charrold is exhibiting a new range of tipper semi-trailers of an all-welded monocoque design.

The 945 Cu ft capacity 28ft-long body of U-form construction has a 6mrn alloy floor supported on heavy-duty -top-hatsection frames and 4mm side walls with extruded box section top rails. The top-hinged tailboard is of one-piece construction. Tipping gear is Edbro 7 CAN front end twin ram.

The semi-trailer chassis comprises three-piece construction main-member !beams 6in. deep by 5.5in. wide. Running gear is ROR tandem axle assembly with multi-leaf springs. Ades are again ROR and have a 20,000lb capacity. The three-line air brake system operates 16.5in, by 7in. S-cam brakes. Tyre equipment is 9.00 — 20.00 14-ply and the plated bogie weight is 18 tons. Gross trailer weight is 27.5 tons and trailer unladen weight 4.95 tons.

Tags


comments powered by Disqus