AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

M9 bridge has more headroom

22nd November 2012
Page 5
Page 5, 22nd November 2012 — M9 bridge has more headroom
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

A NEW CROSSING over the M9, at one of Scotland’s bridge bash hotspots, has been designed to reduce the number of strikes caused by lorries, the Scottish transport minister said. The £2m Chartershall bridge on the outskirts of Stirling replaces an older crossing that was demolished due to damage caused by strikes by high-sided vehicles.

Scottish transport minister Keith Brown said: “Chartershall bridge will help reduce bridge strikes.” He put the cost of such strikes at £500,000 a year. The new bridge is single span and offers more headroom. Since the launch of Transport Scotland’s Strike it Out campaign in 2008, there has been an 80% reduction in bridge strikes on trunk roads in Scotland.


comments powered by Disqus