AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

AYR WAY

21st September 1989
Page 31
Page 31, 21st September 1989 — AYR WAY
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• The 250 million A77 Ayr Road Route is to go ahead as riginally planned, despite a )ublic local inquiry held last fear. The new two-lane dual :arriageway will run for about Wan from the south end of lie M77 at Dumbreck, Glasgow to a junction with the A77 tt Malletsheugh, south of Newon

Tags

Locations: Glasgow

comments powered by Disqus