Pandoro term of trial
Page 19
If you've noticed an error in this article please click here to report it so we can fix it.
OLLOWING a successful trial period, Pandoro have concluded a 12nonth agreement with the Mersey Docks and Harbour Company for heir nightly ro-ro service to Larne. The service has carried 20,000 nits, representing 318,000 tonnes of cargo.
Said Pandoro's general manger Tony Crean: "There has ieen a steady growth in Iroughput on the service desite the general economic HE Central Electricity Generatig Board's South-western reion is advising operators that otification of high-load routes hould be addressed to the lirector of Production, CEGB, :edminster Down, Bridgwater bad, Bristol BS13 8AN (Tel ristol (0272) 648111).
downturn in England and Northern Ireland."
Pandoro started its daily run between Liverpool and Northern Ireland on October 15 last year, with ships arriving at Alexandra Dock at 17.00 hrs to discharge and load in time to clear the port again by 21.00 hrs.
The service began as a threemonth trial running to Larne throughout the week with a discharge on Saturday evening ready for a Monday start.