AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

ROAD NEWS Orbital slow

20th June 1991, Page 29
20th June 1991
Page 29
Page 29, 20th June 1991 — ROAD NEWS Orbital slow
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• Plans to widen the M25 to four lanes between the M4 015) and M40 016) are now underway. The project, which could take two years, will begin in 1992.

Patching it up

I The Department of Transport plans to improve a 2.6km length of the A27 trunk road at Patching, West Sussex.

The proposed section of dual carriageway leaves the A27 west of its junction with Dapper's Lane and goes across Ecclesden Common before crossing Water Lane (A280) south of its junction with the A27.

Am ■ ATHE DEPARTMENT OF TRANSPORT

The route continues across the stream feeding Patching Pond to a new two-level junction with the A280 near Potlands Copse. East and west facing slip roads would be provided at the junction to give access to and from the detrunked A27 and the local road network.

From the junction the route heads east before re-joining the existing dual two-lane A27 just east of Titnore Lane.

Contact 071-261 8803.