AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

ROADS NEWS

16th November 1989
Page 45
Page 45, 16th November 1989 — ROADS NEWS
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

CHARMOUTH CONTRAFLOW • A contraflow system is now in operation at Penn near Charmouth, Dorset, because of work to connect the western end of the Charmouth bypass to the A35.

The roadworks will take about one month during which time an 80knith speed limit (50mph) is in force.

Contact (0272) 273767 for more details.

Tags


comments powered by Disqus