AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Take off

12th September 1975
Page 70
Page 70, 12th September 1975 — Take off
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

A rear mounted full torque power take off for Ford four, six and eight speed gearboxes has been developed by Jonas WebSter.

The pto bolus on !to the countershaft extension at the rear of the gearbox, in place of the countershaft dust cover. The units are designed for applications such as blowers, winches and skip loaders. Air control is fitted as standard, although conventional cable control can be offered.

Available from : Jonas Webster (Engineers) Ltd, Folds Road, Bolton, BL1 251, Lancs.