AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Blackwall re-opening

4th April 1969, Page 26
4th April 1969
Page 26
Page 26, 4th April 1969 — Blackwall re-opening
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• When the old Blackwall tunnel re-opens on Friday (April 4) an electronic signalling system will help to prevent over-height vehicles entering. The left-hand lane has a 13ft 4in. height limit, but the right-hand lane (limited to cars and motorcycles), is only 9ft 5in. high.

Tags