AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Cable treatment unit for Middle East

29th August 1969, Page 34
29th August 1969
Page 34
Page 34, 29th August 1969 — Cable treatment unit for Middle East
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• A mobile, self-contained cable-oil-treatment unit is being supplied by British Insulated Callender's Construction Co. Ltd., 7 Mayday Road, Thornton Heath, Surrey, to the Ministry of Electricity and Water, Kuwait.

Built on a Bedford 4 x 4 chassis it is equipped with a 15 kVA diesel-electric generator mounted in a separate compartment to drive the oil degasifying unit. The latter is used for cable installation and maintenance work on oil-filled cables.

The vehicle also carries the necessary ancillary equipment for this work including vacuum pumps, impregnating and drain bottles and so on. A workbench provides storage for tools and fittings and there is a length of cable on a drum for alternative mains supply when available.

Air conditioning equipment has been fitted to cater for climatic conditions in the Middle East and the vehicle has a double-skin thermally insulated body, specially designed by the Outside Testing Department of the BICC company.

Tags

People: Thornton Heath
Locations: Surrey