AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Blackwall Tunnel

17th October 1969
Page 40
Page 40, 17th October 1969 — Blackwall Tunnel
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

• Work is to start on the construction of Blackwell Tunnel Northern Approach on Monday, November 3, and will last about 2+ years, the GLC announced last Friday.

In order to keep traffic delays to a minimum during the duration of the works, a number of permanent and temporary traffic arrangements will be introduced from time to time, including the closure of a number of roads.

Tags


comments powered by Disqus