AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

M25 pushes ( through Ken

5th November 1983
Page 17
Page 17, 5th November 1983 — M25 pushes ( through Ken
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

WORK WILL start shortly oi 8.6 mile (13.8km) section 01 M25 London orbital route tween Swanley and Seven■ in Kent.

The construction pei should take 27 months when completed, the whol the motorway south of Thames will be open to tr, Transport Minister Ly Chalker predicted.

Mrs Chalker said that col erable efforts have been ma, the design of the new secti( minimise its effect on the through which it passes.

The contract with John L Construction is worth £38.5r

Tags

People: Ly Chalker
Locations: London

comments powered by Disqus