AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

ROADS

4th August 1994, Page 26
4th August 1994
Page 26
Page 26, 4th August 1994 — ROADS
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

M4 maintenance

E The new stretch of roadworks between J3 and J4 on the M4 is scheduled to take eight weeks to complete, finishing in mid-September. A contraflow will operate between the junctions, with possibly only one lane in each direction open overnight.

G The westbound entry slip at J3 and the London-bound entry slip road at J4 will be closed, and traffic will be diverted via the A312, A9 and the M4 Heathrow Airport spur.

Contact 071-276 0800.

Tags

Locations: London

comments powered by Disqus