A ramp constructed from bolted steelwork sections for ease of erection and subsequent movement has been produced by Tay Lyn Engineering. The first section, which is inclined at 9deg to the ground, is 25ft long and at its top end is 4ft high.

Following the ramped section there is a flat length of 23ft.

The ramp, which must be located on a levei, concrete site, can take up to 10 tons per track. It is finished in a protective rubberized paint.

Made by: Tay Lyn Engineering Co Ltd, New Street, Halfway, Sheffield S19 6GH.