• M6 Cheshire J20-21A Widening work. Slip road from eastbound M62 to M6 southbound. 50mph speed limit in force.

• M6J30-31 M61 interchange. Widening works with southbound carriageway reduced to two lanes with 50rnph speed limit.

• M5 J16 Southbound. Entry sliproad closed with a diversion in operation. Until June.

• M1 1 J4-9. Overnight lane closures for sign maintenance until the end of May.

• M25 J7-8 in Surrey Motorway widening continues until July with 50mph speed limit in place and slip mad closures.

• M66 J4 (M62 J18). Tidal flow in operation. J4 southbound access slip closed. Until September 95.

• Al Cambridgeshire. Contraflow in place to allow annual mad marking trial to be inspected. Until June.

• A2 Canterbury bypass. Contraflows in place while major works undertaken. Until June.

• A3 Surrey. One carriageway closed with contraflow in place. Severe delays at peak times until end of June.