AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

A68 subsideni at Dalkeith

16th July 1983, Page 11
16th July 1983
Page 11
Page 11, 16th July 1983 — A68 subsideni at Dalkeith
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

A SECTION of the A68 E burgh to Newcastle road subsided and a weight limi 1.5 tonnes for all vehicles ill north has been imposed.

The Lothian and Bard Police is keeping a close wi on the situation and has war that vehicles not following di sion signs but instead cont ing to use the damaged sec of the A68 may face prosecut The damaged stretch of r is just north of Dalkeith, Mi thian, and vehicles over tonnes must now take the s posted diversion via Buccle St, Dalkeith, Esbank Rd (A60 Esbank Roundabout and the All southbound traffic has b routed on a short diversion Lugton Village Rd.

Diversions are likely to several months and opera wishing to move abnormal lo in this area should contact thian and Borders Police Trt Department for a suitable rou


comments powered by Disqus