AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

THE LATEST COAL-TAR FUEL SYSTEM MEWS reaches us of further

16th December 1939
Page 28
Page 28, 16th December 1939 — THE LATEST COAL-TAR FUEL SYSTEM MEWS reaches us of further
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

alterna tive fuel developments. Mr. G. Mangoletsi, 4, King's Road, Sale, Cheshire, is the engineer responsible for the latest. His system has proved particularly well adapted for coal-tarproduct fuels, as its effect is to minimize crankcase dilution.

The scheme is to feed the, fuel through a special atomizer from which the rich mixture passes into an exhaustheated chamber. Thence, in an atomized state, it flows through a diffuser tube into the induction manifold. It is of note that the operation of the air valve, in relation to the atomizer throttle is controlled by an hydraulic damper.

New Fuel Recovery Plant AT the request of the Government, the Walsall Gas Committee is to proceed with the installation, at the Pleck gas works, of new benzoic and toluole recovery plant at an estimated cost of £7,000.

Bendix Gesture to Employees

MANY employees of Bendix, Ltd., Tyseley, Birmingham, are now serving with His Majesty's Forces in widely differing capacities. The company has, therefore, made arrangements whereby all these employees and those who are doing full-time national defence work receive an allowance to augment their service pay.

Tags

Organisations: Walsall Gas Committee
Locations: Birmingham

comments powered by Disqus