AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

TUNNEL DELAY

14th March 2002, Page 6
14th March 2002
Page 6
Page 6, 14th March 2002 — TUNNEL DELAY
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

Drivers endured long delays trying to get through the Frejus tunnel last week when roadworks halted two-way traffic. Trucks were backed up on both sides of the tunnel after authorities would only let them through M one direction at a time. For details of oneway plans for the Mont Blanc tunnel, see page 12.

Tags


comments powered by Disqus