AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

ISO tank to cut load timl

9th March 1979, Page 24
9th March 1979
Page 24
Page 24, 9th March 1979 — ISO tank to cut load timl
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

THE VISE of ISO tank tainers has cut loading tin two-thirds where they been introduced to carry powder for BP Chemicals Previously all loads been carried in contai lined with plastic bags to vent the possibility of tamination. The sy: operated by Unispeed t requires only spending s 45 minutes on site corn with up to three hours the previous system.

Compaction of pow during transit within the (30ft) 39cum (1,350( capacity aluminium tank: been overcome by the lopment of special aen equipment.

Unispeed is the lea operator of bulk powde • mountable tanks in the with an operational net, which extends throug Western Europe and Netherlands.

Tags


comments powered by Disqus