AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Loading bridge

28th September 1973
Page 66
Page 66, 28th September 1973 — Loading bridge
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

Winni dock levellers distributed by Abbey Plant can be fitted to existing docks for -single position" operation, or be rail mounted to serve several dock locations. The bridge is hydraulically lowered on to a vehicle platform and automatically adjusts its height to that of the platform during loading /unloading.

Four basic models are available with bridge dimensions to suit individual specification.

Marketed by: Abbey Plant Co, 1261 Ashton Old Road, Manchester M11 1 DA.

Tags


comments powered by Disqus