AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

The Severn Bridges Tolls Order 2010, 1 January 2011 Increased

20th January 2011
Page 30
Page 30, 20th January 2011 — The Severn Bridges Tolls Order 2010, 1 January 2011 Increased
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

tolls for the Severn Bridge and Second Severn Crossing. For large goods vehicles the increase is from £16.40 to £17.20 444tifiWq:1 The M48 Motorway (Junctions 1-2) (Severn Bridge High Winds) (Temporary Prohibition and Restriction of Traffic) Order 2010,4 December 2010 Regulations prohibiting vehicles from the Severn Bridges and connecting roads, when there is a danger of high winds.

The Motor Fuel (Composition and Content) and Merchant Shipping (Prevention of Air Pollution from Ships) (Amendment) Regulations 2010,14 January 2011

Changes to fuel specification, including permitting a biofuel content in diesel of between 7% and 30% and reducing permitted levels of sulphur in gas oil for

non mobile plant. Tog-t-W:Mit*

ADR changes The 2009 text of the carriage of dangerous goods rules (known as ADR) introduces additional changes from 1 January 2011 to the carriage of dangerous goods packed in limited quantities, including new placarding requirements for transport units over 12 tonnes tare weight that are carrying limited quantity goods in excess of „ 8 tonnes. —


comments powered by Disqus